Key components to consider and researched for a project report of constructing residential school in India
Construction & Interiors
Study of location & maximum utilization
Case Report on Designing and constructing the buildings with number of class-rooms, toilets, staff rooms, extra curricular activity areas and all other areas as per requirements
Case Report on Designing and constructing the buildings for catering to dining and rest activities.
Case Report on Designing and constructing the buildings for Hostels and hostel related activities like study rooms, common rooms, infirmary, and other medical arrangements.
Case Report on Design of furniture and listing of equipment required with their optimum utilization methods.
Academics
Affiliation Choices & Methodologies (ICSE, CBSE, Cambridge etc)
Selection of Academic Personnel, Administrative Personnel and General Staffs.
Setting of Syllabus detailed Study Material and Time-Table for Studies and Home Work.
Setting of Sports and Extra Curricular Facilities as additional activities for the students.
Case study on Technology Implementation
Case Study on Student learning & profiling
Accounting & Finance
Project Report for the construction of residential school.
Monthly/Annual running expenses of the School/Centre and its gestation period.
Media & Publicity
Web Portal
Median Campaign
Project Funding
Identifying finance consultants who organize funding for Educational Institutions through NRI, BANKS, Trust etc.
for more details visit EdMetrix - Enabling Meaningful Education
Posted at 3/7/2007 7:53:42 pm by Sameeta